Costing truck body production: methods and common mistakes

Materials, labour, components, subcontractors, overheads and warranty. How to calculate the full cost of a body and check it against reality afterwards.

Trucklo editorial team Updated: · 3 min read
Costing truck body production: methods and common mistakes

W skrócie

  • A full costing covers materials, labour, bought-in components, subcontractors, shop and general overheads, documents and tests, and a warranty reserve.
  • The most common mistake is leaving out overheads and non-productive time: changeovers, rework, waiting for material.
  • A pre-calculation is only useful if it is compared with actual cost after the job.
  • With volatile steel and aluminium prices, a shorter quote validity or a price adjustment clause helps.

Body cost structure

Cost groupCoversHow to calculate
Materialsprofiles, sheet, panels, fittings, consumablesbill of materials with a scrap allowance
Direct labourcutting, welding, assembly, paintinghours per operation times rate
Bought-in componentsrefrigeration unit, tail lift, crane, lightingsupplier prices with validity dates
Subcontractorsgalvanising, painting, testingsubcontractor quotes
Shop overheadsenergy, depreciation, building upkeeprate per labour hour
General overheadsoffice, sales, administrationpercentage or per-job charge
Documents and teststype approval, ATP, EN 12642per type or per job
Warranty and riskwarranty repairs, reworkreserve based on history

Pre-calculation and post-calculation

The pre-calculation is made before the quote and relies on standards: how many hours an operation takes, how much material a body type uses. After the job it must be compared with actual cost. The differences show which standards are out of date and which jobs lose money despite a good price.

Material prices

Steel, aluminium and panels can change price within weeks. A quote valid for three months in volatile markets puts the risk on the builder. A shorter validity period helps, as does a price adjustment clause linked to material prices, or buying material straight after the contract is signed and the deposit paid.

Most common mistakes

  • Overheads left out: energy, depreciation, administration
  • Non-productive time: changeovers, rework, waiting for material
  • Out-of-date component prices: supplier quotes without a date
  • No warranty reserve
  • No comparison with actual cost

Frequently asked questions

How do I calculate the production cost of a body?

Add up materials, labour by operation, bought-in components, subcontractors, shop and general overheads, documents and tests, and a warranty reserve.

What is a post-calculation?

A comparison of the cost planned before the quote with the actual cost after the job.

How can I protect against rising material prices?

With a shorter quote validity, a price adjustment clause, or buying material right after the contract is signed.

Show your company to customers

Join the catalog and receive qualified B2B leads.

Dołącz do Trucklo Jak to działa
Trucklo Editorial
Trucklo routes truck bodywork enquiries to manufacturers who build them.