W skrócie
- A full costing covers materials, labour, bought-in components, subcontractors, shop and general overheads, documents and tests, and a warranty reserve.
- The most common mistake is leaving out overheads and non-productive time: changeovers, rework, waiting for material.
- A pre-calculation is only useful if it is compared with actual cost after the job.
- With volatile steel and aluminium prices, a shorter quote validity or a price adjustment clause helps.
Body cost structure
| Cost group | Covers | How to calculate |
|---|---|---|
| Materials | profiles, sheet, panels, fittings, consumables | bill of materials with a scrap allowance |
| Direct labour | cutting, welding, assembly, painting | hours per operation times rate |
| Bought-in components | refrigeration unit, tail lift, crane, lighting | supplier prices with validity dates |
| Subcontractors | galvanising, painting, testing | subcontractor quotes |
| Shop overheads | energy, depreciation, building upkeep | rate per labour hour |
| General overheads | office, sales, administration | percentage or per-job charge |
| Documents and tests | type approval, ATP, EN 12642 | per type or per job |
| Warranty and risk | warranty repairs, rework | reserve based on history |
Pre-calculation and post-calculation
The pre-calculation is made before the quote and relies on standards: how many hours an operation takes, how much material a body type uses. After the job it must be compared with actual cost. The differences show which standards are out of date and which jobs lose money despite a good price.
Material prices
Steel, aluminium and panels can change price within weeks. A quote valid for three months in volatile markets puts the risk on the builder. A shorter validity period helps, as does a price adjustment clause linked to material prices, or buying material straight after the contract is signed and the deposit paid.
Most common mistakes
- Overheads left out: energy, depreciation, administration
- Non-productive time: changeovers, rework, waiting for material
- Out-of-date component prices: supplier quotes without a date
- No warranty reserve
- No comparison with actual cost
Frequently asked questions
How do I calculate the production cost of a body?
Add up materials, labour by operation, bought-in components, subcontractors, shop and general overheads, documents and tests, and a warranty reserve.
What is a post-calculation?
A comparison of the cost planned before the quote with the actual cost after the job.
How can I protect against rising material prices?
With a shorter quote validity, a price adjustment clause, or buying material right after the contract is signed.