W skrócie
- Lean starts with a value stream map for one body type, not a plant-wide rollout.
- Typical wastes in body building are waiting for chassis and material, rework, searching for tools and stock on the shop floor.
- Tools such as 5S, standard work and kanban for small parts need little investment.
- Measure lead time, rework hours and on-time delivery, not the number of tools introduced.
- 7 types of waste in classic lean
Seven wastes in body manufacturing
| Waste | Shop-floor example | What helps |
|---|---|---|
| Overproduction | cutting parts for stock with no order | build to order, kanban |
| Waiting | for chassis, material, the paint shop | delivery scheduling, buffers only where needed |
| Transport | moving parts across the whole hall | stations laid out along the flow |
| Over-processing | finishing beyond the spec | clear quality standards |
| Inventory | profiles and panels sitting for months | buying per order, rotation |
| Motion | searching for tools and drawings | 5S, shadow boards |
| Defects | weld rework, badly cut parts | standard work, checks at the station |
Where to start
Pick the body type you build most often and map the path from order to handover. Mark where work stops: waiting for material, a decision or a free station. It often turns out that actual work on the body is a small part of the total lead time, and the rest is waiting.
Standard modules
Bodies built to order still have repeatable parts: subframes, walls, doors, toolboxes. Standardising modules lets you build them at a steady pace and add the custom elements at the end. That shortens lead times and cuts errors without giving up the fit to the customer.
What to measure
- Lead time: from order to handover
- Rework hours: per body and per type
- On-time delivery: share of bodies delivered on time
- Inventory: value of material on the shop floor
Frequently asked questions
How do I introduce lean in body manufacturing?
Start with a value stream map for one body type, remove the biggest wastes, introduce 5S and standard work, then extend to other types.
Does lean make sense for build-to-order production?
Yes. Bodies built for a customer still have repeatable modules and operations that can be standardised.
What wastes does lean identify?
Overproduction, waiting, transport, over-processing, inventory, motion and defects.
Show your company to customers
Join the catalog and receive qualified B2B leads.
Dołącz do Trucklo Jak to działaTrucklo routes truck bodywork enquiries to manufacturers who build them.