W skrócie
- In multi-stage type approval the body builder is responsible for the conformity of what it added or changed (Regulation (EU) 2018/858).
- The technical file covers drawings, weight and axle load calculations, material lists, test reports and manuals.
- New machinery fitted to bodies, such as tail lifts, cranes and compactors, falls under Regulation (EU) 2023/1230 from 20 January 2027.
- Whoever substantially modifies machinery may be treated as its manufacturer (art. 18 of the Machinery Regulation).
- 2018/858 EU vehicle type-approval regulation
- 20 Jan 2027 Machinery Regulation (EU) 2023/1230 applies
Who is responsible for what
The chassis is an incomplete vehicle approved by the chassis maker. The body builder completes it as the next stage and is responsible for the conformity of what it added or changed: dimensions and masses, lighting, side and rear underrun protection, mountings. That is how Regulation (EU) 2018/858 describes multi-stage type approval. One-off bodies can also go through individual approval procedures.
The body's technical file
| Document | Purpose |
|---|---|
| Assembly and dimension drawings | dimensional conformity, basis for testing |
| Weight and axle load calculations | payload, permitted axle loads |
| Material list and certificates | traceability, warranty claims |
| Welding procedures and welder qualifications | repeatable quality |
| Test reports | e.g. EN 12642, ATP, lighting, underrun protection |
| Operating manual and data plate | user, registration, service |
| Machinery declarations of conformity | tail lifts, cranes, compactors |
Machinery on bodies
Tail lifts, cranes, compactors and similar equipment are machinery. New machinery placed on the market from 20 January 2027 falls under Regulation (EU) 2023/1230, which replaces Directive 2006/42/EC. If a body builder substantially modifies a machine, it may be treated as its manufacturer and take on those obligations (art. 18). The safest course is to follow the equipment makers' installation instructions and document every change.
Before producing a new body type
- Approval route: stage type approval, small series or individual approval
- Chassis makers' guidelines: for every make you support
- Requirements list: regulations, standards, customer requirements
- Test plan: what must be tested and where
- Customer document templates: certificate, manual, data plate
Frequently asked questions
What is a body builder responsible for in type approval?
For the conformity of what it added or changed in the vehicle, under the multi-stage rules of Regulation (EU) 2018/858.
Which documents should a body builder prepare?
Drawings, weight and axle load calculations, material lists, test reports, a manual, a data plate and declarations of conformity for fitted machinery.
When does the new Machinery Regulation apply?
From 20 January 2027. It replaces Directive 2006/42/EC.
Sources
- EUR-Lex: Regulation (EU) 2018/858 (approval and market surveillance of motor vehicles and trailers)
- EUR-Lex: Regulation (EU) 2023/1230 on machinery (applies from 20 January 2027)
Show your company to customers
Join the catalog and receive qualified B2B leads.
Dołącz do Trucklo Jak to działaTrucklo routes truck bodywork enquiries to manufacturers who build them.